|
|
|
Community Enhancement and Special Projects
Community Enhancement 2010
Saturday, September 25th
United Indians of All Tribes Foundation
Daybreak Star Indian Cultural Center
Discovery Park|Seattle
Every year, NAIOP gives back to the community. Working through the
Community Enhancement Committee, we find a worthy project that can
accommodate about 300+ workers in a single day. Projects that don't
meet the specific criteria often gets completed as part of our Special
Projects.
Thank you to our 2010 Sponsors/Contributors!!
$3,000
M.A. Mortenson
Summit Law Group
$2,500
Associated Builders & Contractors of Western
Washington
Coughlin Porter Lundeen
Sparling
MulvannyG2 Architecture
University Mechanical
Valley Electric
$750 - $1000
CREW Seattle & Sound
GLY Construction
Hill-Raaum-Pietromonaco
Holmes Electric
Hos Brothers
Lease Crutcher Lewis
Lighthouse Electrical Group
Matthew G. Norton Co.
Microsoft Corporation
NBBJ Architects
Northwest Building LLC
PCS Structural Engineers
Seneca Real Estate Group
Skanksa USA Building Inc
Union Bank of California
U.S. Bank of Washington
Wright Runstad & Company
$250 - $500
Broderick Group
Burgess Design, Inc.
Cadman
Clise Properties
Collins Woerman
COMgroup, Inc
Daily Journal of Commerce
Gull Industries
HDR Engineering Inc.
Hinthorne Mott Architects
KeyBank Real Estate Capital
Landau Associates
McClone Construction
McKinstry Company
Perkins+Will
Robert S. Arron
WHPacific
Espresso Cart
Greg & Karen Krape
In-Kind
Andersen Construction
Bayley Construction
DLR Group
Foushee & Associates, Inc.
Recent Projects:
1990 Eastside Friends of Youth - Renovated
a converted residence into a transitional housing facility for teen
mothers.
1991 Ryther Child Center - Painted and repaired school facility
including landscape areas of the school.
1992 Little Bit Therapeutic Riding Center - Painted all buildings
and renovated an office area for the agency.
1993 Ruth Dykeman Children's Center - Painted and repaired
buildings and did landscaping work.
1994 The Source Child Center - Painted, repaired buildings,
built a shed and completely landscaped the grounds and built new
play areas.
1995 Thornton Creek - "Daylighted" a salmon stream
that had been diverted through culverts, created streambeds, plantings
along the new bank, walkways, bridges and other landscaping of the
area.
1996 YMCA Camp Terry - Extensive rehabilitation of cabins,
painting, construction of picnic areas and bleachers, and creation
of forest paths.
1997 Northgate Elementary School - Re-landscaped the entire
school grounds, painted exterior of building, created new bus loading/unloading
zone and did murals in the play area.
1998 Brighton Elementary School - Removed asbestos and lead,
repainted all exterior trim, removed and replaced entire landscaped
area of the school.
1999 Marymoor Park - Rehabilitated a 300-foot section of
the Sammamish River to create a salmon habitat. Involved planting
3,000 native plants and some structural work.
2000 T.T. Minor School - Created an outdoor instructional
environment area with native plants, planters, walkways and seating
areas, painted and re-landscaped the entire exterior of the school,
did some interior classroom painting.
2001 Little Bit Therapeutic Riding Center - Built seven shelter
sheds for horses, replaced and/or rehabilitated 2,500 feet of wooden
fence, painted exterior of buildings and did some landscaping.
2002 Des Moines Beach Park - Painted and repaired exterior
of seven buildings, planted 750 feet of creek front to restore a
salmon-spawning stream, built 600 feet of rail fence and three public
viewing platforms over the stream.
2003 The Girl Scouts Camp River Ranch - Over 300 volunteers
completed painting of numerous buildings, widened existing hiking
trails, and constructed 7 new covered wagon sleeping structures
for the girls to sleep in! Kimbell Elementary School ( Special Project
) - installed new fixed benches and picnic tables outdoor teaching
area.
2004 Ruth Dykeman Children's Center - Installed new jogging
path on 7 acre site, painted exterior of existing classrooms / buildings,
installed new landscaped beds around perimeter, and refurbished
basketball / tennis court.
Seattle Children's Home ( Special Project ) - Renovated existing
Rewards room with new flooring, paint, ceiling and art work.
2005 The Happy Medium School - An alternative teaching school
located in the Junkin's Place neighborhood in Central Seattle. Updated
existing playground area, refinished portable classroom buildings
and decks, refinished indoor playstructures in classrooms, added
paver patio for drop off area, installed a secret garden to be used
by the students to grow vegetables for the local food bank.
Childhaven ( Special Project ) - Removed existing rudown playground
equipment and installed new playground equipment.
2006 The Bailey Gatzert Elementary School - Central area
elementary school located in the Squire Park neighborhood. We renovated
exterior play areas, installed new paver walkways at school entrances,
new landscaping at existing planter beds, added retaining walls
at playground area, resurfaced the existing asphalt playground,
refurbished teaching garden with new planter boxes and renovated
the existing baseball field.
2007 Northgate Elementary School - Installed new playground
equipment along with new concrete curbs, added pavers paths at drop
off areas, painted exterior of classroom building, new fencing around
playground, resurfaced playground areas including added new striping
for basketball and tetherball courts, and landscaping added to planting
beds.
2008 Camp Long- Installed and updated walking paths, added
a butterfly garden, constructed a fire pit with log benches, painted
exterior of cabins and landscaping added to planting beds.
2009 Ryther Child Center - Installed and updated walking
paths, added and enhanced garden areas, constructed fencing, painted
exterior of cabins and landscaping added to planting beds.
For more information on sponsorship levels click
here.
Date
last modified:
Tuesday July 27 2010
|
|